A Method for Identifying Requirements Critical to Mass Reduction Using DSMs and DMMs
DSM 2009: Proceedings of the 11th International DSM Conference, Greenville, SC, USA, 12.-13.10.2009
Year: 2009
Editor: Kreimeyer, M, Maier, J, Fadel, G, Lindemann, U
Author: McLellan, J. M.; Maier, J. R. A.; Fadel, G. M.; Mocko, G. M.
Section: Managing Complex Engineering Design Projects
Page(s): 197-205
Keywords: Mass Reduction, DSM, DMM, Requirements, Components